
South Wiltshire
Solar & battery · Salisbury, Wiltshire
Salisbury and the villages south of it towards the New Forest are a straight run up the A338 from us.
Fitted locally
These are completed jobs from our own records in the SP5 postcode area, not examples. Each was designed from a survey of that roof and installed by our own team.
Battery only
Tesla Powerwall, 13.5 kWh
Battery only
Tesla Powerwall, 13.5 kWh
Case studies near Salisbury

South Wiltshire
Good to know in Salisbury
Our recent work on the Salisbury side has been battery storage: Powerwalls added to homes in the villages south of the city. A battery needs no planning permission. For panels, the city centre conservation area and listed buildings need checking first.
Every design starts from a drone survey and a 3D model of your roof, so the panel layout, shading and yield are worked out on your house before anything is ordered.
Where we work
Based at Unit 8, Westcroft Business Park, Three Legged Cross, Wimborne BH21 6FQ.
What it costs
£14,000 to £17,000
Most homes: 10 to 12 panels with a Tesla Powerwall 3. Roughly £1,300 per panel with the battery included.
£8,000 to £12,000
Around £620 per panel installed. Designed battery-ready so storage can be added later.
from £7,500
One Powerwall 3 with the Backup Gateway. Expansion packs £4,500 each when you need more storage.
Installed and certified at 0% VAT. The full price guide · Tesla Powerwall 3 in detail
Good to know
The same as anywhere we work, because the price follows the roof and the kit, not the postcode. From the systems our customers have bought: solar with a Tesla Powerwall 3 is typically £14,000 to £17,000, solar only £8,000 to £12,000, and a Powerwall 3 on its own from £7,500, all installed and certified at 0% VAT. Your quote comes from a survey of your own roof.
Yes. We work in Salisbury and nearby in Downton, Redlynch, Whiteparish, Alderbury and the surrounding area, from our unit at Three Legged Cross, Wimborne. The same team does the survey, the design, the installation and the paperwork.
Usually not. Most roof solar on a house is permitted development, and a battery needs no planning permission. The exceptions are listed buildings, conservation areas and National Parks, where the rules on where panels can go are tighter. We check the position for your address before we design.
We do. We make the DNO application, register the system with MCS so you can be paid for what you export, and give you a full handover pack.
Start here
Send us your details and we'll book a free survey or, with photos and a recent bill, quote from those. Prefer to talk? Call 0330 320 1500.