top of page
menu
2
Live Chargepoints.
7
Future Proofed.
1
Grant.
design
Job Overview.
Modulift are a premium supplier of modular heavy lifting equipment. Based in Poole they have designed and delivered systems around the world.
In a push to increase their fleet to EV, Vanadium worked with Modulift to design and install a modular EV system that would allow an easy process for adding chargers in the future.
Using 2x Easee's Charge units and 7x Easee Ready units, Vanadium delivered a solution that ticked all the boxes while making sufficient savings utilising the Government Staff and Fleet grants.
See Savings below..
drone
Equipment Overview.
Charger.
Easee Charge
Power.
22kw
Qty.
2
Grants Overview.
Spaces Covered.
9
EV Ready Spaces.
7
Live EV Spaces.
2
Grant Saving.
9x £500
2x £350
Grant Type.
Staff and Fleet
Total Grant Saving: £5200
installation
1/8
Enquire today.
bottom of page